Kitchen Refacing Saves Time & Money
Rated 4.9 out of 5from 121 customer reviews

Refacing keeps the kitchen you know and replaces everything you see — doors, drawer fronts and hardware, made in North America and fitted by our own crews. No demolition, no month of takeout.
- Made in North America
- Never outsourced
- Installed in 3–5 days
- Reuses your cabinet boxes
- Serving homeowners since 2006
- Free in-home estimates
Beautiful Cabinetry Made In North America
We reface — not rebuild. Your layout stays, your cabinet boxes stay, and the parts you touch every day are replaced with new ones.
- Doors and drawer fronts made in North America
- Installed by our own in-house contractors
- 20 years of kitchen refacing experience
- Your cabinet boxes stay in your kitchen, not in a landfill


Three Steps, One Week, No Demolition
Most kitchens are finished in three to five days — and usable most evenings along the way.
Request a free estimate
We bring the showroom to you — doors, finishes and hardware, seen in your own kitchen light.
Create your new look
Choose the door style, colour, countertop and hardware with a designer, not a catalogue.
Schedule your install
Our own installers reface the kitchen in 3–5 days and clean up every evening.
Three Ways To Save Right Now
All three apply to a full refacing project. The first two are alternatives — take the countertop or keep yours — and the price match stands whichever you choose.
Free Quartz Countertop
Worth up to $3,000

Choose a new quartz countertop on us, in any of the colours we carry, fitted as part of the refacing.
*An estimate must be scheduled with an installation within 6 months. Countertop max cost up to $3,000.
Keep Your Countertop
Take $3,000 off instead

Happy with the counters you already have? Keep them in place and take the same value straight off the price of your kitchen.
*An estimate must be scheduled with an installation within 6 months.
Beat Your Best Quote
We go $1,500 lower

Bring us the most competitive quote you have from another kitchen cabinet refacing company and we will beat it by $1,500.
*Quote must be from another kitchen cabinet refacing company.
Refacing Is The Smarter Investment
A full remodel means demolition, dust and a month of takeout. Refacing gets you the same kitchen everyone compliments, in a week, for about half the spend.
“New Look did a fantastic job refacing my cabinets.”C. Snow — Westbury, NY
| Measure | Refacing | Full remodel |
|---|---|---|
| Timeline | 3–5 days | 4–8 weeks |
| Typical spend | $10k–$18k | $25k–$45k |
| Demolition | None | Full tear-out |
| Your layout | Kept | Rebuilt |
Our Customers Love Their New Kitchens
Real reviews from our Google Business Profile, alongside kitchens we have finished across Long Island.
- Rated 5 out of 5
“Excellent work, very skilled workers, great materials, it took only three days to do the entire kitchen refacing, I highly recommend them.”
- Rated 5 out of 5
“I've had 2 kitchens refaced from New Look in 2 different houses years apart. If I wasn't truly satisfied, I would have never used them again…”
- Rated 5 out of 5
“Everything was done in a professional manner from start to finish. Installation was timely and clean. Kenny made sure everything was done to perfection!”
- Rated 5 out of 5
“Extremely happy with the work done. Haroon and his partner sid an excellent job.”
- Rated 5 out of 5
“…I love my new cabinets & drawer fronts. I changed colors of one set of cabinets from white to black and the work was incredible.”
What Homeowners Ask Us First


The parts you see and touch are new — doors, drawer fronts, hardware and the veneer on every exposed frame. What stays is the box that was already built into your wall.

Let’s Talk About Your Kitchen
You deserve a kitchen you love to cook, dine and entertain in. Tell us a little about the space and we’ll bring the showroom to you — no deposit, no obligation.
Current Offers
Free Quartz Countertop — Worth up to $3,000
*An estimate must be scheduled with an installation within 6 months. Countertop max cost up to $3,000.
Keep Your Countertop — Take $3,000 off instead
*An estimate must be scheduled with an installation within 6 months.
Beat Your Best Quote — We go $1,500 lower
*Quote must be from another kitchen cabinet refacing company.









