Skip to content
(516) 221-0656
New Look Kitchen Refacing

Kitchen Cabinet Refacing Updates the Look of Your Kitchen in 3–5 Days

Rated 4.9 out of 5from 121 customer reviews

A two-tone kitchen with white shaker upper cabinets, navy base cabinets, brushed-brass hardware and a marble tile backsplash behind a stainless rangeA kitchen completed by New Look Kitchen Refacing

Refacing replaces every surface you see on a cabinet and keeps the box it is built on. No demolition, no month of takeout, and no moving out of your own kitchen — and because it is priced by the door, you can work out roughly what yours will cost before anyone visits.

  • Made in North America
  • Never outsourced
  • Installed in 3–5 days
  • Reuses your cabinet boxes
  • Serving homeowners since 2006
  • Free in-home estimates

What Is Kitchen Cabinet Refacing?

Kitchen cabinet refacing replaces every surface you see on a cabinet — the doors, the drawer fronts, the hinges and handles, and a matching veneer across each exposed frame — while the cabinet boxes stay bolted to the wall. Nothing is torn out, so there is no demolition, no re-plumbing and no re-wiring.

That is the whole difference from a remodel, and it is why the work takes three to five days instead of four to eight weeks. Your layout does not move. The sink stays where the pipes are, the range stays where the gas is, and the kitchen is usable most evenings while the job runs.

What you are buying is the visible half of a kitchen: new fronts in a style you choose, made in North America, cut to fit boxes that were built into your house and are usually still square decades later.

A cordless drill boring the handle holes in a refaced white cabinet doorA completed kitchen with cream raised-panel cabinets, glass-front upper doors, dark granite counters and a mahogany island under a white quartz top

What Does Cabinet Refacing Cost?

Kitchen cabinet refacing on Long Island costs $250 to $450 per door or drawer front. A standard 10×10 kitchen carries about 40 of them, which puts most projects between $10,000 and $18,000. What moves a kitchen through that range is the door style and material you choose — not the size of the room.

Count the doors and drawer fronts in your own kitchen and multiply. That is genuinely how the estimate is built, and it is why we can publish a number at all: refacing is priced by the piece, so the arithmetic works before anyone visits.

Navy shaker cabinet doors with a slim brass bar pull, under a white counter
A kitchen completed by New Look Kitchen Refacing

Why Every Website Gives You a Different Number

Search the cost of refacing a kitchen and the first page of Google will tell you it is $508, $2,009, $6,750, $15,000 and $25,000 — a fifty-fold spread for the same job. That is not because the work varies that much. It is because those figures are measuring different things and none of them says so.

The lowest are peel-and-stick veneer kits, or the cost of doing a single cabinet. The highest are national averages that quietly include full cabinet replacement. In between sit lead-generation sites publishing ranges wide enough to be true of any job in the country. Very few of them are a contractor naming a price for work they would actually turn up and do — which is the only kind of number worth anything to you.

What Changes the Price

In roughly the order they matter.

  1. How many doors and drawer fronts you have

    The count is the multiplier. A galley kitchen and an L-shaped one with an island are different jobs at the same rate per piece.

  2. Door style and material

    The whole spread from the low end of the range to the high end. A flat-panel laminate and a raised-panel hardwood are the same labor and very different materials.

  3. Drawer boxes

    Replacing the boxes behind the fronts, rather than only the fronts, is the most common addition.

  4. Hardware

    Hinges and handles are included. Soft-close mechanisms and pull-outs are not.

  5. Glass, accessories and panels

    Glass inserts, spice pull-outs and panels to hide a dishwasher each add to the count.

  6. Countertops

    A separate trade and a separate price — which is what the countertop offer below is about.

When Refacing Is the Wrong Answer

The most-asked question about refacing is what is wrong with it. Here is the honest answer, because you will find out either way — better now than after a deposit.

Refacing does not change your layout. If you want the sink moved, a wall taken down or the range relocated, no amount of new doors gets you there. That is a remodel, and we will tell you so rather than sell you a kitchen you will still want to change.

It cannot fix a failing box. A cabinet swollen under a leaking sink, shelves that sag, a carcass coming apart at the joints — the box is the part refacing keeps, so a bad one stays bad behind a new door. We check for this at the estimate, and where we find it we say the boxes need replacing.

It is not the cheapest option. Painting the doors you already have costs a few hundred dollars in materials and a weekend. If the budget is the binding constraint and the door style is fine, paint them. Refacing is worth its price when the style is what you want changed.

A dark-stained kitchen island with a white quartz waterfall top and a gas cooktop, against white perimeter cabinets and stainless wall ovens

Refacing Against a Full Remodel

The comparison that decides it, in the terms that actually differ. Both leave you with a kitchen that reads as new; only one of them takes the room away from you for a month to do it.

“New Look did a fantastic job refacing my cabinets.”
C. Snow — Westbury, NY
Cabinet refacing compared with a full kitchen remodel
MeasureRefacingFull remodel
Timeline3–5 days4–8 weeks
Typical spend$10k–$18k$25k–$45k
DemolitionNoneFull tear-out
Your layoutKeptRebuilt

How a Refacing Project Runs

Three steps, and the only one that takes your kitchen out of use is the last.

  1. Request a free estimate

    We bring the showroom to you — doors, finishes and hardware, seen in your own kitchen light.

  2. Create your new look

    Choose the door style, color, countertop and hardware with a designer, not a catalog.

  3. Schedule your install

    Our own installers reface the kitchen in 3–5 days and clean up every evening.

What Refacing Actually Looks Like

Real kitchens our crews refaced across Long Island and the boroughs — the same boxes, new fronts.

A black granite island with seating for three, against high-gloss white flat-panel cabinets and a stainless range hood
A kitchen completed by New Look Kitchen Refacing
Slate-blue shaker cabinets with reeded glass-insert upper doors, granite counters and an exposed brick backsplash
A wide island topped with heavily veined marble-look stone, between espresso shaker base cabinets and cream shaker uppers
A kitchen completed by New Look Kitchen Refacing
A kitchen completed by New Look Kitchen Refacing
Dark cherry raised-panel cabinets running two walls of a kitchen, with a carved border on every door and brushed-nickel handles
A kitchen completed by New Look Kitchen Refacing
A white shaker peninsula under a speckled grey-and-white quartz counter, against mint-green walls and a light oak floor
Cream raised-panel cabinets around a stainless over-range microwave, with a split-face stone backsplash and granite counters
A white raised-panel kitchen with a small central island, dark green granite counters and stainless wall ovens
Cream glazed raised-panel cabinets with a built-in wine lattice and desk return, over green granite and a tumbled-brick backsplash
A white shaker kitchen with a custom paneled hood, marble-veined counters and a pale glass mosaic backsplash
A professional stainless range beneath a custom white hood, framed by glass-front shaker uppers and marble-veined counters
Charcoal-grey raised-panel cabinets with stainless appliances, a stone mosaic backsplash and speckled counters
White raised-panel cabinets over dark green granite, with a white subway backsplash and a stainless gas range
A beverage station in white shaker cabinets, with glass-front uppers and a dramatically veined stone backsplash run full height
Pale grey shaker cabinets with brushed copper bar pulls, beside a stainless range and a warm-toned granite counter
A light grey shaker pantry and coffee wall with a woven tile backsplash, beside a navy island
A navy island under a white quartz top, between cream shaker runs, lit by three hand-blown pendants
Greige shaker cabinets around a stainless farmhouse sink, under red art-glass pendants
White cabinets with black cup pulls against mint-green walls, under speckled granite beside a garden window
A floor-to-ceiling wall of white shaker pantry cabinets flanking a stainless refrigerator, over a veined marble floor
Slate-blue shaker cabinets and stainless wall ovens against an exposed red brick wall
Cream shaker cabinets around a granite peninsula, with a taupe glass subway backsplash and brushed-steel bar pulls
A tall run of cherry raised-panel cabinets built around a stainless side-by-side refrigerator, with a matching crown and brushed-steel bar pulls

Three Ways To Save Right Now

All three apply to a full refacing project. The first two are alternatives — take the countertop or keep yours — and the price match stands whichever you choose.

Free Quartz Countertop

Worth up to $3,000

A refaced kitchen with grey shaker cabinets, an apron sink and hardwood floors
Claim This Offer

Choose a new quartz countertop on us, in any of the colors we carry, installed as part of the refacing.

*An estimate must be scheduled with an installation within 6 months. Countertop max cost up to $3,000.

Keep Your Countertop

Take $3,000 off instead

Refaced cabinets and drawer fronts in a bright kitchen
Claim This Offer

Happy with the counters you already have? Keep them in place and take the same value straight off the price of your kitchen.

*An estimate must be scheduled with an installation within 6 months.

Beat Your Best Quote

We go $1,500 lower

A kitchen completed by New Look Kitchen Refacing
Claim This Offer

Bring us the most competitive quote you have from another kitchen cabinet refacing company and we will beat it by $1,500.

*Quote must be from another kitchen cabinet refacing company.

Cabinet Refacing Questions

Refacing does not change your layout. If you want the sink moved, a wall opened up or the range relocated, that is a remodel and refacing cannot get you there. It also cannot rescue a failing cabinet box — one swollen under a leaking sink, or with shelves that sag — because the box is the part that stays. Everything you see is replaced; everything holding it up is not.

Let’s Talk About Your Kitchen

You deserve a kitchen you love to cook, dine and entertain in. Tell us a little about the space and we’ll bring the showroom to you — no deposit, no obligation.

Or call us directly(516) 221-0656
4.9 out of 5 from 121 customer reviews

Current Offers

Free Quartz Countertop — Worth up to $3,000

*An estimate must be scheduled with an installation within 6 months. Countertop max cost up to $3,000.

Keep Your Countertop — Take $3,000 off instead

*An estimate must be scheduled with an installation within 6 months.

Beat Your Best Quote — We go $1,500 lower

*Quote must be from another kitchen cabinet refacing company.

Free Consultation

Helps us confirm we cover your area.
Optional — roughly how many doors and drawers?

By submitting, you agree that we may call or text you about your estimate. Message and data rates may apply; reply STOP to opt out. See our privacy policy.